Congratulations on winning the bid of Baishi Luohe sorting center project
2020/7/15
47754
标签:
Belt conveyor
express logistics sorting equipment
retractable belt conveyor
drawer assembly line
belt turning machine
receiving conveyor
climbing conveyor
logistics auxiliary equipment
In March 2020, our company successfully won the bid of "Baishi Express - Luohe sorting center equipment construction" project of Baishi express
"Baishi express" is a well-known Express brand of Baishi group. It became a member of Baishi group in October 2010. It takes informatization and automation construction as its core competence, and takes the lead in exploring the transformation and upgrading of express industry by means of informatization in China, and its comprehensive strength ranks in the forefront of the industry. Since the reform and transformation in 2008, the company has been working in the automation equipment and express sorting equipment industry, and has made good achievements. The equipment has accumulated many years of experience and constantly updated products. The level of various equipment is in the high level stage of the industry.
This phase of the project in Luohe Baishi distribution center to build equipment, such as belt conveyor, DWS + arm swing machine and other supporting models. The amount of the project involved is 24 million, and the project period is expected to be 3 months. The express parcel sorting equipment and other supporting equipment will be built. Through the project, Luohe distribution center will be taken as the local express sorting and transportation center as the central point, so as to improve the speed of Express sorting and transportation in this area. And monitoring the dynamic flow direction of packages. After winning the bid, the company also set up a "Luohe Baishi special project" team at the first time, carried out project special research meetings for many times, and determined the basic direction of the project. In the special meeting, the general manager pointed out: "the construction site is like a battlefield! From the moment the project plan is decided, it is the moment when we are faced with the test. We should take it seriously, in line with the company's development policy, wholeheartedly do a good job in the project, and hand in a satisfactory answer sheet for customers
"Baishi express" is a well-known Express brand of Baishi group. It became a member of Baishi group in October 2010. It takes informatization and automation construction as its core competence, and takes the lead in exploring the transformation and upgrading of express industry by means of informatization in China, and its comprehensive strength ranks in the forefront of the industry. Since the reform and transformation in 2008, the company has been working in the automation equipment and express sorting equipment industry, and has made good achievements. The equipment has accumulated many years of experience and constantly updated products. The level of various equipment is in the high level stage of the industry.
This phase of the project in Luohe Baishi distribution center to build equipment, such as belt conveyor, DWS + arm swing machine and other supporting models. The amount of the project involved is 24 million, and the project period is expected to be 3 months. The express parcel sorting equipment and other supporting equipment will be built. Through the project, Luohe distribution center will be taken as the local express sorting and transportation center as the central point, so as to improve the speed of Express sorting and transportation in this area. And monitoring the dynamic flow direction of packages. After winning the bid, the company also set up a "Luohe Baishi special project" team at the first time, carried out project special research meetings for many times, and determined the basic direction of the project. In the special meeting, the general manager pointed out: "the construction site is like a battlefield! From the moment the project plan is decided, it is the moment when we are faced with the test. We should take it seriously, in line with the company's development policy, wholeheartedly do a good job in the project, and hand in a satisfactory answer sheet for customers
Let's wait and see!
Hot News
- Congratulations on winning the bid of Baishi Luohe sorting center project
- e皮带输送机安装的详细步骤及注意事项,想自己安装的看过来!
- 2020 tail teeth campaign
- Sorting automation equipment plays an important role in
- Express does not close during 2021 Spring Festival
- 祝贺我司中标《郑州申通项目》
- 双11来了菜鸟无人仓遍地开花 行业增百条流水线
- 太仓顺天诚招全国代理商
- 快递流水线---解决爆仓的
- 电商流水线、杭州快递流水线车间流水线布局的原则